




We just wrapped up the topout on a new two-bath casita build out at Pegasus Airpark in Queen Creek. This is the kind of work that doesn't get a lot of attention - but it absolutely should. Everything that gets tiled, trimmed, and finished later depends on this phase going right.
Rough-in is where the whole plumbing system gets established. Supply lines, drain lines, vent stacks - all of it has to be planned, measured, and installed with precision before a single wall gets closed up. We're running PEX supply lines throughout, with hot and cold lines routed cleanly through the framing and properly secured at each fixture location. The tub is set and tied in, shower drain is stubbed through the slab, and all the supply stops are positioned and ready.
One thing we take seriously on new construction is pressure testing. Before we ever sign off on the rough-in, we pressure test the supply lines to make sure everything is tight. No leaks hiding behind drywall, no surprises down the road. That step alone can save a homeowner from a serious headache later - water damage in a brand new build is something nobody wants to deal with.
Casitas and additions are a growing part of what we do. Whether it's a guest suite, an in-law space, or a detached unit like this one, the plumbing work for an addition follows the same standard as any full home build. We treat it that way every single time. Getting the rough-in right is what makes the finish work clean and the final product reliable.
Queen Creek is growing fast, and we love being part of builds like this one. If you're planning an addition or new construction and need a plumbing crew that actually sweats the details - this is what that looks like.